top of page
  • Writer's pictureGisela Schmoll

Architectural Phases

A typical architectural project has seven phases. All projects go through these various steps, though the order and boundaries between one phase and the next may vary. For example, in San Francisco, when creating an addition, permitting happens in two phases. The initial site permit is filed after Design Development, while the permit for construction is filed after the Construction Documents phase and engineering.


Phase 1 – Existing Conditions and Code Research

The first two steps in any project are often critical for success. We start by researching the appropriate zoning code that applies to the site. Zoning varies from city to city AND from neighborhood to neighborhood. San Francisco has a great on-line map that makes basic zoning research easy:


The second step is to spend a day measuring the existing building and site. From these measurements a three-dimensional computer model is created from which the existing floor plans, sections, exterior elevations and site plan are generated. Given that these drawings are the basis of all future work, it's critical that they are accurate. A site survey may be required by a professional surveyor.


Phase 2 - Schematic Design

Once the existing conditions are drawn, we meet with the client to discuss/sketch their design requirements in greater detail. From this meeting the first set of schematic floor plans and three-dimensional line drawings are created. Typically two floor plans are presented to the client. Based on the client's feedback the design is refined and presented again. Depending on both the client and the job, we may create several iterations of the schematic design. The time frame varies greatly for this phase, it may be as little as a month or as long as several months.


At the end of Schematic Design the drawings can be sent for preliminary construction cost estimating and engineering. Additionally, some clients elect to hire a contractor to work with us through the remainder of the phases to manage cost.


Initial floor plans are shown during Schematic Design
Initial floor plans are shown during Schematic Design


Phase 3 - Design Development

In this phase, we begin to develop the details of the design. In contrast to Schematic Design where, for example, we develop the overall floor plan of a kitchen that simply indicates where the big blocks of cabinetry are located, in Design Development we will develop the actual cabinet sizes and refine the proportions. In order to communicate the design intent, interior and exterior elevations are drawn. Initial image boards of finishes and materials are generated so as to hone in on the overall material palette of the project.


At the completion of Design Development, the documents can be utilized for structural engineering, energy analysis and more accurate cost estimating.


3D model of kitchen during Design Development
3D model of kitchen during Design Development

Phase 4 - Construction Documents

The bulk of the work we do happens in this phase. The construction documents are developed sufficiently for construction and that means a tremendous amount of detail drawings. Ideally, the major design details should be drawn to avoid confusion during construction. These include window and door details, cabinetry details, roof overhangs, connection details of decks, guardrails, etc. If left undrawn, many design decisions will be made by the contractor and the final result may not reflect the design intent or result in costly errors during construction.


The construction documents represent the final design approved by the client. With our assistance, the client should review the drawings very carefully as changes made later can add substantial cost, both in professional fees and construction change orders.

Detail drawing completed during the Construction Documents phase


Detail drawing completed during the Construction Documents phase
Detail drawing completed during the Construction Documents phase


Phase 5 - Permitting

The construction documents are submitted to the city Planning and Building Departments for review. If the project is an interior remodel then it will not be subject to Planning review and in some cities may obtain an over-the-counter permit. If exterior changes are required, the process could be quite lengthy. Once the drawings have been reviewed, the city will send the architect “plan check comments”. These are usually small revisions that need to be made to the drawings to be code compliant. Most projects have one round of comments, but some may incur a second round. Once all changes are accepted by the city, the permit is issued to the general contractor.


Phase 6 - Bidding and/or Negotiations

While the drawings are being reviewed by the city, the project is sent to general contractors for bidding. Typically three to four contractors bid on a job. The architect usually manages the bid process by answering questions the contractors may have, completing walk-throughs of the site and comparing bids. We will provide a list of contractors that we have worked with in the past that have a track record of good workmanship and completing jobs on budget.


Alternatively, the client may choose to do a negotiated bid with on general contractor. Given the current backlog that most reputable contractors are experiencing, this will allow the client to get into a contractor’s queue prior to completion of construction drawings. In this scenario, construction usually starts as soon as the permit is issued. With competitive bidding there may be a delay between the permit being issued and construction commencing.


Phase 7 - Construction Observation

At this point, the general contractor becomes the lead person on the project and the architect takes on a supporting role. The contractor is responsible for all aspects of construction including inspections, construction methods and ordering all parts/supplies. We will be available to address any issues that arise. The amount of construction observation required varies greatly. For smaller projects, we may be on site once a month, for larger projects, site visits may occur weekly. We will schedule regular walk-throughs with both the contractor and client to discuss construction issues and review the progress of the work. The client should always address construction questions to the architect and we will discuss them with the contractor. A clear chain of communication is important in order to avoid costly rework. Once construction is finished, the contractor, client and architect do a final walk-through of the job site. Any items needing attention are added to a punch list for the contractor to correct before receiving final payment from the owner.

3 views0 comments

Recent Posts

See All
bottom of page